Phase 2 completes as main sections of Vinh Tuy Bridge 2 joined

Phase 2 completes as main sections of Vinh Tuy Bridge 2 joined

The main segments of the second-phase construction of Vinh Tuy bridge spanning Hong (Red) River (Vinh Tuy Bridge 2) in Hanoi was connected on May 30.
Tet returnees block Mekong Delta-HCM City highways

Tet returnees block Mekong Delta-HCM City highways

With people returning to HCM City from the Cuu Long (Mekong) Delta after Tet (Lunar New Year), highways have been severely congested in the past two days.